KineticBuild & Engineering +65 6000 0000 Free site survey

Fit-outs that finish on programme

Kinetic Build & Engineering runs A&A works, M&E and factory fit-outs across Singapore, with every trade on our own payroll.

You get a programme like this for your own job before you sign, and a report against it every Friday.

Precision-parts factory, Woodlands16,000 sq ft fit-out · 12-week programme · today is week 8

  1. Site survey, week 1
  2. Hacking, weeks 2 to 4
  3. M&E first fix, weeks 4 to 7
  4. Ceilings, weeks 7 to 9
  5. M&E second fix, weeks 9 to 11
  6. Testing and commissioning, weeks 11 to 12
  7. Handover, end of week 12

On programme

Friday report, week 8

Ceiling 60% closed on the production floor. M&E second fix starts Monday in the clean assembly room.

What we build, and how long it takes

We rewire and cool whole halls Technician testing a distribution panel, fit out factories down to the epoxy Factory floor with marked walkways, and weld mezzanines Welder on a steel beam in our own yard in Sungei Kadut.

  • A&A works

    New openings, partitions, toilets, loading bays and extensions, with QP coordination and permits.

    4–10 weeks

    from S$45,000

  • M&E engineering

    Power upgrades, switchboards, lighting, ACMV, plumbing and sanitary, and fire protection, by our own engineers.

    2–12 weeks

    from S$15,000

  • Factory and warehouse fit-outs

    Production lines, cleanroom-grade rooms, epoxy floors, racking zones, compressed air and three-phase power.

    6–16 weeks

    from S$120,000

  • Office and showroom fit-outs

    Glass partitions, ceilings, lighting, data cabling and pantries in industrial B1 and B2 buildings.

    4–8 weeks

    from S$60,000

  • Structural steel and mezzanines

    Mezzanine floors, platforms, canopies and pipe racks, fabricated in Sungei Kadut and endorsed by a PE.

    3–8 weeks

    from S$38,000

  • Term maintenance

    Planned servicing for ACMV, electrical and fire systems, a 24/7 line and four-hour response to critical faults.

    Every month, ongoing

    from S$1,200 a month

Three handovers, drawn to scale

Each photo is as long as the job took, on one scale of weeks, from first hacking to keys back.

Roastery showroom ceiling with exposed spiral ducting, cable trays and orange pendant lamps

Café-roastery and showroom, Kallang

7 weeks, handed over 4 days early

A bare light-industrial unit turned into a roastery, tasting bar and showroom, with the ducting the owner wanted left on show.

Area
4,200 sq ft
Scope
Roaster exhaust, ACMV, lighting, grease trap, glass partitions
Result
Open in time for launch weekend
Plant room ceiling with new stainless steel pipework, cable trays and ventilation ducts

Pharma packing plant M&E upgrade, Tuas

10 weeks, nights and weekends

A new main switchboard, rerouted cable trays and process piping for two packing lines, above a line that never stopped.

Area
38,000 sq ft
Result
Zero hours of unplanned downtime

“They worked three weekends straight so our line never stopped. The daily photos meant I could update my GM without driving to Tuas.”

Melvin T., facilities manager
Long industrial hall with steel portal frames and a polished concrete floor

Warehouse to food factory, Jurong

14 weeks, A&A and change of use

An empty warehouse re-planned for a food manufacturer: new loading bays, a power upgrade, epoxy floors and a two-storey mezzanine office.

Area
62,000 sq ft
Scope
A&A submission, loading bays, three-phase upgrade, epoxy floor, steel mezzanine
Result
Production moved in the week after handover

“Fixed price, fixed date, and they hit both. The submissions were the part we dreaded most. Kinetic simply handled them.”

Aisyah R., operations director

Engineers first, since 2009

One payroll

Kinetic started in a Kallang shophouse office, founded by two M&E engineers tired of watching builders and subcontractors argue over whose problem it was. Today 58 people, from electricians and ACMV technicians to steel fabricators and nine project managers, work for one company under one safety system.

Live premises

Most of our jobs are in places that never close. We phase the work zone by zone, keep noisy and hot work to nights and weekends, and hand a zone back only when your operations team signs it off. Every morning starts with a toolbox talk; hot work, heights and confined spaces need a permit.

  • Marcus LimManaging director. M&E engineer, 25 years on factory jobs.
  • Priya RamanHead of projects. Owns every programme, reads every Friday report.
  • Hafiz OsmanSafety and quality. Toolbox talks, audits and permits.
  • Jason OngDesign and submissions. Drawings, QP liaison, approvals.
Engineer in a white hard hat checking a floor plan pinned to a column on site
Setting out against the drawings, the day before hacking starts.

Questions before a fit-out

Do you handle authority submissions for A&A works?

Yes. We prepare the drawings and work with a Qualified Person on BCA plan approval, SCDF fire safety submissions and URA change-of-use applications where needed. Most factory A&A submissions are cleared in three to six weeks, and we build that time into your programme from day one.

How long does a factory fit-out take?

A typical 10,000 to 20,000 sq ft factory or warehouse fit-out takes 8 to 14 weeks from signed quote to handover. That covers submissions, M&E, partitions, ceilings, flooring and testing. You get a week-by-week programme before you sign, and a progress report against it every Friday.

Can you work while our factory or office stays open?

Yes. Most of our jobs are in live premises. We phase the works zone by zone, schedule noisy and hot work at night or on weekends, and keep shutdowns to windows agreed in advance. Your operations team signs off each zone before we move to the next one.

Do you take on small A&A or M&E jobs?

Yes. We take jobs from about S$15,000, such as new power points and a distribution board for a production line, an extra toilet, or a mezzanine office. Small jobs get the same project manager, safety paperwork and 12-month defects cover as our large ones.

What does a site survey cost?

Nothing. The first site survey is free anywhere in Singapore. An engineer visits within two working days, measures the space, checks your existing electrical and ACMV capacity and talks through the brief. You receive a written scope and budget range within five working days, with no obligation.

What happens after handover?

Every project includes a 12-month defects liability period, as-built drawings and O&M manuals. If something fails, we attend within 24 hours, or within 4 hours for critical M&E faults. Many clients then move to a term maintenance contract covering ACMV, electrical and fire protection systems.

Book a free site survey

Send the basics. An engineer calls you back within one working day, and the survey costs nothing.

  1. Day 1. We call you back.
  2. By day 3. An engineer surveys the site.
  3. By day 8. Written scope and budget range.

Office on Kallang Way, steel yard in Sungei Kadut. Visits by appointment.

Site survey request

We reply within one working day. No sales calls, no mailing lists.

Thanks! This is an example website, so no message was sent.